Skip to content
Aurora

The Sharing Playbook

How to share a project brief with competing suppliers

Share one project brief with competing suppliers. Keep it current, keep each supplier's talks separate and give all of them the same basis. Free worksheet.

Supplier Reviews · Aurora Datarooms

Archive Date Published
Colleagues sort supplier folders beside a project plan in a bright office with blue cabinets.

Get The Free Worksheet

When several suppliers are pricing the same job, give them all the same project information and keep each supplier's commercial conversation to itself. Before the first invitation goes out, name the person who keeps the brief up to date, decide how you'll announce changes and check what each recipient will be able to see.

The first invitation is the easy part. Then a drawing changes. One bidder asks a question. Another brings in a specialist. A price assumption turns out to be wrong. Without a plan, suppliers end up quoting against different versions, or one of them sees something meant for someone else.

Work out who needs what

Say a business is asking three contractors to quote for a warehouse upgrade. Each contractor needs the scope, the site information and the timetable. The business also has its own budget discussions and a separate thread of commercial correspondence with each contractor.

Those documents do different jobs. Before you share anything, decide what a contractor needs to put together a useful proposal and who looks after that information.

MaterialWho sees itWho looks after it
Project scope and shared technical informationInvited contractorsProject lead
Current timetable and site-access instructionsInvited contractorsProject coordinator
Internal budget discussionsInternal team members who approve the budgetBudget owner
One contractor's commercial correspondenceYour internal team, and that contractor where it makes senseCommercial lead
A specialist's supporting materialPeople who need it for that part of the reviewLead for that workstream

Use this as a starting point. What you actually share depends on the project, your agreements and any procurement rules that apply.

Keep one source pack and look after it

Pick one place where the person responsible updates the shared project documents. Give files names that say what they are, and make their status obvious: draft, issued for quotation, superseded, or whatever labels your process uses.

Open the actual files before you invite anyone. Look through attachments, worksheets, comments and document properties for anything that should stay internal. Locking down a folder won't remove confidential information that's already inside a file you share.

Keep internal working notes out of the issued collection. If working material and supplier-ready material stay apart, each later update only touches the issued set.

Keep each supplier separate

Give each supplier the collection that fits its work. Keep supplier-specific questions and answers apart from the material every bidder sees.

If a supplier brings in a specialist, decide what that person needs before you give access. A site surveyor may need the technical material and none of the commercial papers. Where your system allows it, give people individual access so you can review who's involved when responsibilities change.

If files contain personal information, ask whether the task really needs those details. The UK Information Commissioner's Office advises sharing only the personal information that's needed and sending it securely to the right recipient. Rules vary by country and situation. ICO data-sharing advice.

Agree how changes will be issued

Picture a revised electrical drawing that changes the scope halfway through the quotation period. Swapping the stored drawing is only part of the job. Suppliers also need to know what changed and whether they have to revise their proposals.

For each material update, write down:

  • Which document changed, and its revision or issue date.
  • What changed, in plain terms.
  • Which suppliers need the update.
  • Whether the deadline or the quotation assumptions moved.
  • Who will send the update and answer questions.

Announce issued changes through the same channel every time. In a formal procurement, follow the procedure that applies to clarifications and equal treatment. A document-sharing tool doesn't settle those obligations for you.

Can suppliers download the brief?

Some reviewers need to download drawings or work offline. Others only need to read. Decide which each supplier needs, and tell people which source to check before they rely on a file.

A downloaded copy stays on the recipient's device after you update the source or remove their access. Removing access doesn't recall it, and saved copies never update on their own. When something material changes, ask recipients to check the current issue.

Look at it from the supplier's side

Before you send invitations, go through the collection as each supplier will see it. Can they find the scope, the timetable and the technical information for their package? Are your internal notes and the other suppliers' papers out of sight? Do they really need download access? Who do they contact if a document is missing?

When the review ends, check who still has access and keep records the way your project agreed. A record that someone opened a document helps with follow-up. It doesn't prove they understood a change or accepted a contract term.

How this works in Aurora

In Aurora, the project documents live once in a library, and each supplier gets its own room showing only the documents you pick. Access groups and individual permissions narrow access further inside a room. When you replace a document in the library, each room sharing it shows the current version when people reopen or refresh it, and earlier versions stay in history. Copies people have already downloaded stay as they were.

Your team still decides what to disclose, how to announce important changes and which procurement process to follow.

Before the next invitation

Write down four things: where the source pack lives, which documents each supplier gets, who looks after them and how revisions will be issued. Check them again whenever the brief changes.

To see how selected documents and supplier access fit together, take the product tour. If you'd like to try it, start a 30-day free trial and set up your first supplier room. No card is required. The trial includes one organization, unlimited libraries, two rooms, three internal users, 25 external users and 10 GB of storage.

Related guides: choosing what each audience receives and keeping shared documents current.

Supplier brief and revision worksheet

Free to use and adapt. Keep your completed worksheet in your own project files.

Download Worksheet (.md)

Use this before inviting suppliers and whenever issued information changes. Keep your answers in your internal project records. Each supplier gets only the issued information meant for them.

Set up the review

QuestionYour decision
What proposal or decision do you need?
Who maintains the issued source documents?
Who approves material for sharing outside the team?
What is the response deadline?
Where can participants find the current issued pack?
How will they receive clarifications and revision notices?

Decide who gets what

List real document names and audiences. Replace the example rows with your own.

Document or collectionCurrent issueAudienceView or downloadWho looks after it
Shared scopeInvited suppliers
Issued drawingsSuppliers who need them
Internal budget discussionsInternal budget team
One supplier's commercial correspondenceThat supplier and your internal team

Record a revision

FieldUpdate
Document and new issue or date
Previous issue it replaces
What changed
Who needs the update
Effect on scope, assumptions or deadline
What you're asking recipients to do
Who is issuing the change, and when
Where the current source lives

Suggested revision notice:

[Document] has been updated to [issue/date]. The change affects [scope or assumption]. Please use the current file at [source] and [requested action] by [date]. Contact [person] with questions.

Check before sending

  • Open the actual files and check comments, hidden worksheets, attachments and document properties.
  • Check that internal notes and other suppliers' correspondence are left out.
  • Check that each supplier can find the current scope, timetable and the files for their package.
  • Decide whether downloads are needed and tell suppliers where the current version lives.
  • Announce material changes and follow the procedure agreed for the project.

Downloaded copies stay on the recipient's device and don't update when the source changes. A record that a file was opened doesn't show that anyone accepted a change.

Prepared by Aurora Datarooms. This resource is free to use and adapt for your own project. Companion guide: /guides/sharing-project-brief-competing-suppliers.

Sources