Before you close an external document review, write down which files each audience received, which versions supported the decision and who still owes an answer. Save that record where your team can open it after guest access ends. Then close the sharing routes that have finished and test one that should stay open.
The venue has signed off on the exhibition layout. The designers are packing the model into its crate when someone asks, "Did they also approve the lighting budget?" The latest budget in the project folder is revision 3. The venue saw revision 2. Closing the room will settle neither question.
Write down what actually finished
Put a sentence at the top of the closing note that a colleague could act on next week. For the exhibition, it might read: "The venue approved layout B on Tuesday. Lighting costs remain open. The producer will send a separate estimate on Friday."
Keep the reply that supports the decision, with its date, sender and location. A file made available to the venue, a file someone opened and a layout someone approved are three different things. If all you have is the room selection, write "available to the venue." If approval was verbal, record what you heard and ask the person who can confirm it to reply.
Record the files from the review
Use one row per issued file and audience. Include the revision that was shared, where your team can find that exact copy and the decision or question attached to it. Check against what the recipient had at the time. A link that now opens a later revision can quietly change the story.
| File and audience | What the venue could see | What belongs in the closing note |
|---|---|---|
| Exhibit layout, venue team | Layout B, issue 4 | The venue producer approved this layout by email on Tuesday. Keep issue 4 and the reply together. |
| Lighting estimate, venue producer | Estimate 2, dated Monday | Costs remain open. Estimate 3 exists internally and has not been sent. |
| Fabricator's cost breakdown, studio only | Outside the venue selection | Keep the internal reference with the studio. Omit its filename and figures from the venue's note. |
Start with your issue list, sent message or a dated selection you already trust. If you cannot tell which revision went out, write "revision unconfirmed," say who will check and keep the supporting correspondence.
Give unfinished work a home
Choose a contact, next action and due date for each open item. Decide where the reply should go once the review closes. In this example the venue can email the producer about the lighting estimate. The fabricator can keep using its separate project space.
Keep the internal note and the copy you send outside separate. Private questions, pricing comments and other reviewers' names can slip into an export. Firmex gives a concrete example: its Q&A archive text can include internal communications, while its spreadsheet export contains a different selection. Inspect the actual file before forwarding it. Firmex's guide to ending Q&A and choosing an export.
Close the routes people used
Check the named guests, group memberships, invitations and sharing links that applied to this review. Record which ones ended, who made the change and when. A broad link and direct access are different routes. Microsoft explains where owners can inspect and change them in OneDrive or SharePoint. Microsoft's sharing controls.
Ask a cooperating reviewer to reopen a previously working link after the cutoff. Then ask a continuing teammate to open a file they still need. Save both results. Closing access to a shared source cannot recall ordinary files already downloaded or emailed. If your agreement calls for return or deletion, assign the follow-up and record the actual reply.
Leave a record a colleague can use
Give a colleague who may see the internal record three questions: Which layout did the venue approve? Which estimate did it receive? Who owes the next answer? Have them find the files and reply using only the closing note. Fix any link that requires the departed reviewer's account. Keep the permitted copies under your organization's records policy. Ask the person responsible for records before deleting anything subject to an outstanding request or hold.
Use the free review closeout worksheet to try this on one finished review. It includes an internal file list, a short note you can send outside and a place to record both access checks.
Try it with two sample files
In Aurora, your team can keep files in a library and choose which ones a room shares. Put a sample layout and an internal estimate in one library. Share only the layout with a colleague in a test room. Record the version they could see, then have them confirm the layout by email. Keep the reply and the version reference in the worksheet.
When the practice review ends, remove that colleague's room access and ask them to reopen the room. Have a continuing library member check the layout as well. One library, one room and two sample files fit the Starter trial. Start a free trial or use the worksheet with your current sharing tool.
If one person is leaving while the wider review continues, follow the steps for removing a departing advisor's access.
External review closeout worksheet
Free to use and adapt. Keep your completed worksheet in your own project files.
Download Worksheet (.md)Copy this worksheet into the project's internal record. Fill it out while you can still check the room, correspondence and issued files. Share only the separate recipient note with the people who need it.
Describe the end of the review
- Review and audience:
- Cutoff date, time and time zone:
- Person responsible for this record:
- Decision and its scope:
- Who confirmed it, when and where the reply is kept:
- Open question, next action, contact and due date:
Record what each audience received
| File or item | Audience | Revision available or sent | Location of exact copy | Decision or open question |
|---|---|---|---|---|
| Exhibit layout | Venue team | Issue 4, layout B | Internal issued set / issue 4 | Venue producer's Tuesday email approves layout B |
| Lighting estimate | Venue producer | Estimate 2 | Internal issued set / estimate 2 | Producer to send revised costs Friday |
| Your file |
Write "revision unconfirmed" if the records do not settle the question. Name the person who will check and where they can look. An opened file alone does not confirm agreement.
Check access and copies
| Route or copy | What should happen | Who will check | Actual result, date and follow-up |
|---|---|---|---|
| Venue guest access | End at the agreed cutoff | Room owner and cooperating reviewer | |
| Fabricator's separate project space | Continue | Fabrication lead | |
| Estimate downloaded for the review | Follow agreed handling instructions | Venue producer | |
| Sharing link, group, invitation or attachment |
- Internal record location and who may open it:
- Person responsible for retention, any hold and next review date:
- Exact copies and replies opened successfully by a continuing colleague:
- Anything the team could not verify:
Send a short recipient note
"Thanks for reviewing [project]. We recorded [specific decision] against [file and revision] on [date]. [Person] will follow up on [open item] by [date] via [channel]. Your review access ends at [time and time zone]. Please let [contact] know if a file version or decision in this note differs from your record."
Remove internal filenames, other audiences' material and private comments before sending. Keep the note you actually sent.
Test the handover
Ask a colleague to find the exact file used, the recorded reply and the owner of the open question. Record the date, any missing item and who will correct it.